Tepco to inject cement instead of frozen water wall — Fukushima Dairy

” On 6/2/2016, Tepco reported to NRA (Nuclear Regulation Authority) that they need to inject cement to “frozen” water wall and NRA admitted it.

The feasibility of frozen water wall project was questioned since before the beginning. In the meeting of NRA, Tepco admitted the temperature remains nearly 10 ℃ at 4 “freezing” points to cause no improvement to stop contaminated groundwater. It has been in freezing operation for over 2 months.

These 4 points are situated between the reactor buildings and the sea. The volume of contaminated water to be pumped up has not been decreased regardless of the frozen water wall.

Tepco states the temperature remains over 0 ℃ because of the high speed of groundwater. They inject cement to slower the water. ”

by Iori Mochizuki

source

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s